Search Illustrations⌕ Search

Biodiversity Heritage Library · page-32854211

New Bedford Harbor Superfund Project, Acushnet River Estuary engineering feasibility study of dredging and dredged material disposal alternatives. Report 7, Settling and chemical clarification tests — Illustration, Page 20

New Bedford Harbor Superfund Project, Acushnet River Estuary engineering feasibility study of dredging and dredged material disposal alternatives. Report 7, Settling and chemical clarification tests — Illustration, Page 20
Image from Biodiversity Heritage Library. Open full-resolution scan ↗ · See original source for reuse permissions.

About this illustration

BHL classifies this scanned page as Illustration. Publication: New Bedford Harbor Superfund Project, Acushnet River Estuary engineering feasibility study of dredging and dredged material disposal alternatives. Report 7, Settling and chemical clarification tests. Publication creators (not identified as the page's illustrator): Wade, Roy.; Waterways Experiment Station (U.S.); United States. Environmental Protection Agency. Region I.. Contributing institutions: MBLWHOI Library. Bibliographic metadata supplied by BHL under CC0; image rights are separate.

Source connections

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

1988. New Bedford Harbor Superfund Project, Acushnet River Estuary engineering feasibility study of dredging and dredged material disposal alternatives. Report 7, Settling and chemical clarification tests — Illustration, Page 20. https://www.biodiversitylibrary.org/page/32854211

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related illustrations