Biodiversity Heritage Library · page-32854207
New Bedford Harbor Superfund Project, Acushnet River Estuary engineering feasibility study of dredging and dredged material disposal alternatives. Report 7, Settling and chemical clarification tests — Illustration, Page 24
About this illustration
BHL classifies this scanned page as Illustration. Publication: New Bedford Harbor Superfund Project, Acushnet River Estuary engineering feasibility study of dredging and dredged material disposal alternatives. Report 7, Settling and chemical clarification tests. Publication creators (not identified as the page's illustrator): Wade, Roy.; Waterways Experiment Station (U.S.); United States. Environmental Protection Agency. Region I.. Contributing institutions: MBLWHOI Library. Bibliographic metadata supplied by BHL under CC0; image rights are separate.
Source connections
Explore related subjects
Keep this discovery
Explore connections, maps & timelines
1988. New Bedford Harbor Superfund Project, Acushnet River Estuary engineering feasibility study of dredging and dredged material disposal alternatives. Report 7, Settling and chemical clarification tests — Illustration, Page 24. https://www.biodiversitylibrary.org/page/32854207
Cite the original work for its findings. Save a collection to share your selection of sources.